Insurer · Residential

Drainage Remediation Following Intrusive Validation

Drain smells and backflow from the main sewer during deluge rainfall prompted below-ground investigation. Excavation revealed differences from the earlier survey, leading to a revised repair and installation of a 150mm non-return valve.

Drainage Remediation Following Intrusive Validation

Key Results

2 runs

Previously unidentified connections

150mm

Non-return valve installed

~2m

Downstream section relaid

~3°

Existing backfall identified

Drainage InvestigationIntrusive ValidationInsurance Remediation
01

Client Problem

The policyholder had experienced smells from the drains and, during deluge rainfall, backflow from the main sewer into the property. A third-party investigation proposed repairs around a concealed inspection chamber, but the recorded layout and pipe size could only be checked fully after excavation.

02

Initial Symptoms

Drain odours were reported, followed by sewage backflow into the property during an intense rainfall event. The arrangement of the buried chambers, connections and falls was hidden below ground.

03

Investigation

The team excavated to expose the drainage, identified the incoming connections and checked pipe diameters and levels. These physical findings were compared with the earlier survey before the repair strategy was finalised.

04

Findings

The concealed chamber received two separate drainage runs and needed to remain as a functioning junction. The exposed pipework was 110mm rather than the reported 100mm. The section across the entrance had an approximately 0.8° fall, while an approximately 2m downstream section towards the main drain had an approximately 3° backfall.

05

Root Cause

The downstream backfall required correction, while surcharging of the main sewer during intense rainfall had allowed backflow towards the property. The original proposed arrangement did not reflect the two connections at the concealed chamber or the actual pipe diameter. The fixed main-drain level constrained the fall achievable through the revised section.

06

Recommended Solution

Retain the concealed chamber and functioning entrance pipework, remove the chamber closer to the main drain, form a Y connection and relay the affected 110mm section to improve its fall. Install a 150mm non-return valve to prevent future backflow from the main sewer towards the property.

07

Remediation

The downstream chamber was removed and the connection reconfigured using a Y junction. Approximately 2m of 110mm pipework was relaid and the backfall improved as far as the fixed downstream level allowed. A 150mm non-return valve was installed to guard against a recurrence of main-sewer backflow. The revised drainage was tested and the disturbed ground reinstated.

08

Outcome

Intrusive validation changed the repair from the originally anticipated chamber removal to a targeted downstream intervention. The functioning junction was preserved, the backfall improved within the constraints of the existing main drain, and a 150mm non-return valve fitted to prevent main-sewer backflow into the property. An exact final gradient could not be guaranteed; longer-term performance will be assessed in use.

Start a Project

Discuss investigation, diagnosis or remediation with our team.

Contact Our Team→